BobJ
Alerion 38 "Surprise!"
From a question on the 2009 LongPac sub-board - the SHTP Qualifying Cruise shall be:
1) Made in the entered yacht
2) Not be less than 400 miles
3) Made entirely under sail
4) Non-stop
5) Singlehanded
6) May be between two ports or start/finish at the same port, provided one turning point is at least 100 miles offshore
7) For a multihull, at least one-half shall be downwind (could one hull just be pointed the other way?)
8) Completed within ? months of the Race's starting date (6/19/2010)
Regarding Item 8, since equipment wears out and even a skipper's physical condition can change, there needed to be a time frame added to the rule, i.e. if a skipper/boat combination has not been offshore in 15 years, that would not be acceptable. The question then becomes "How long ago can the Qualifying Cruise have been completed?" We're working on this (@ 8/26/09). Right now it looks like the last two SHTP's (2006 or 2008) or if completed singlehanded, either of the last two LongPac's (2007 or 2009) will count. Other qualifiers will need to have been completed within 24 months of 6/19/2010.
1) Made in the entered yacht
2) Not be less than 400 miles
3) Made entirely under sail
4) Non-stop
5) Singlehanded
6) May be between two ports or start/finish at the same port, provided one turning point is at least 100 miles offshore
7) For a multihull, at least one-half shall be downwind (could one hull just be pointed the other way?)
8) Completed within ? months of the Race's starting date (6/19/2010)
Regarding Item 8, since equipment wears out and even a skipper's physical condition can change, there needed to be a time frame added to the rule, i.e. if a skipper/boat combination has not been offshore in 15 years, that would not be acceptable. The question then becomes "How long ago can the Qualifying Cruise have been completed?" We're working on this (@ 8/26/09). Right now it looks like the last two SHTP's (2006 or 2008) or if completed singlehanded, either of the last two LongPac's (2007 or 2009) will count. Other qualifiers will need to have been completed within 24 months of 6/19/2010.
Last edited: